选择语言
×
English
русский
简体中文
展开菜单
语言
0
首页
产品
制造商
博客
获取报价
关于我们
公司简介
供应链管理
质量控制
剩余物料管理
服务与保修
联系我们
首页
博客
China’s power crunch affects semiconductor companies with local facilities
China’s energy crisis has had a negative impact on firms that maintain component factories and chip packaging facilities in the region.
2022-04-15
TSMC to build $8.8B chip plant in Japan with government support
TSMC will construct an $8.8 billion chip factory in Japan. However, its capacity expansion will likely increase components costs industrywide.
2022-04-03
Chip lead times reach 22 weeks following Chinese power cutbacks
The average lead time for microchips has risen to 22 weeks, a new record and up nine weeks from the same time last year.
2022-01-20
Oppo designing 3nm smartphone chipsets in-house, TSMC handling production
Oppo, a leading Chinese smartphone maker, reportedly plans to release self-designed 3nm SoCs for its future handsets.
2021-12-27
Worsening ABF substrate shortfall could extend global chip shortage beyond 2023
A shortage of ABF substrate, a key semiconductor material, could extend the global chip crisis past 2023.
2021-06-15
Samsung to triple production capacity by 2026 amid rising demand
Samsung announces plans to triple its current production capacity by 2026 amid high demand for its services.
2022-04-08
Texas Instruments to build 300mm multi-fab complex in home state next year
Texas Instruments is establishing a sprawling 300mm chip manufacturing facility containing four fabs for around $30 billion in its home state.
2021-08-29
«
1
2
3
4
5
»
博客标签
TMS320V
Integrated
RM25C512C
30V
ATtiny85
Symbol
10k
UC
GP
Position
Data
PTC
44V
DS
ADS7817EB
Corona Virus (COVID-19)
HCPL
UA741CP
Headers
BSS
LQH
MSP430F135IPMR
CPH
Vishay
Fiber Optic Connectors
NZ2520SB
ALD910017SALI
400V
TIP32C
3.3V
Industry Trends
MCU
Capacitor
LM393PWR
MJE2955T
Infineon
LM2901PWR
AMS
Pressure
Board
Copyright © 2025 ZHONG HAI SHENG TECHNOLOGY LIMITED All Rights Reserved.
隐私声明
|
使用条款
|
质量保证
Top